ThonExpatVietnam
Start

Renewal is a short window, not a second first permit

In plain termsA work-permit (WP) renewal files close to expiry, may run once, and then the cycle ends. Losing the card is a reissue. Changing the job title is a new permit.

Start here — three checks

  1. Window before expiry. 10 days to 45 days.
  2. How many renewals? 1 · each up to 24 months.
  3. Cycle ceiling. 48 months then a fresh issue.

Renew vs issue vs reissue

What you holdWhich clockIf you mix them
Permit still valid, expiry in 40 daysRenewal window is open.You wait until week of expiry and miss the 10-day floor.
Already renewed once, 48 months usedFresh issue. Not a second renewal.HR treats year five like year two.
Card lost, term still runningReissue. The clock does not restart.You file renewal paperwork for a missing plastic.
Health sheet older than12 monthsYou photocopy last year’s medical and call it current.
Common wrong movesThe new-issue window is not this page.
  • Filing 60 days early because that is the new-issue max.
  • Promising a second renewal after the one-time limb is spent.
  • Dating a new labour contract past the remaining permit.
If expiry is already inside 10 daysDo not invent an emergency renewal.
  • Read start-before-issued if someone still intends to work on a pending file.
  • If the job ended, the permit already died — renewal is the wrong form.
Evidence and sources6 dated facts for Work-permit renewal window — once, then a fresh issue

The readable briefing above uses these cells. Open a source only when you need to verify a number, date, or legal gate.

  • Earliest days before expiry to file renewal
    NĐ 219/2025/NĐ-CP Điều 28
    10 dayschecked Aug 2026
  • Latest days before expiry to file renewal
    NĐ 219/2025/NĐ-CP Điều 28
    45 dayschecked Aug 2026
  • Work permit may be renewed this many times
    BLLĐ 45/2019 Điều 155; NĐ 219/2025 Điều 29
    1checked Aug 2026
  • Maximum term of a one-time renewal
    BLLĐ 45/2019 Điều 155; NĐ 219/2025/NĐ-CP Điều 29
    24 monthschecked Aug 2026
  • One permit cycle ceiling before a fresh issue is required
    BLLĐ 45/2019 Điều 155 — 24 + one renewal 24, then new issue
    48 monthschecked Aug 2026
  • Max age of health certificate for renewal
    NĐ 219/2025/NĐ-CP Điều 27
    12 monthschecked Aug 2026

Common questions

When do we file a work-permit renewal?

The renewal window is 10–45 days before expiry. The new-issue window is a different clock (10–60 days before a planned start).

How many times can we renew?

Once, for up to 24 months. After the 48-month cycle ceiling, file a fresh issue. Do not treat year five as a second renewal.

Does a health certificate from last year still work?

The health certificate for renewal may be at most 12 months old. An expired medical sheet is not a reason to skip the window.